Case Study

london eye project management

Introduction Executive Summary Purpose- The purpose of this report is to learn British Airways London Eye's successful experiences on managing such a huge and complicated project. Standard Petitioning and Plane Sailing However, not all was lost for the Eye. People even tied the knot up in the Eye. Heavy winds can affect the utilisation of the eye forcing it to stop also heavy snowfall can delay and reduce the amount of rotations the eye can perform or worse snowfall could mean that the London eye will not be operational. The Times and the Kitchen Table From the early 1990s onwards, even while recovering from the excesses of the 1980s, many were already looking ahead to do as the singer Prince so aptly put it - 'party like it's 1999'. In conclusion, Mace chose Asta Powerproject as the new methods of scheduling, it helped to complete the complicated project in the fixed time. Maintenance costs include a safety check on all parts of the eye especially the hydraulic motors, drive systems, safety systems and the backup safety system.

Next

Project management

london eye project management

Probably a reference to the cry of the. Then comes the gentle descent. Potential solutions are identified and evaluated and a preferred solution identified. Once on, your slow ascent begins. Weather conditions The weather conditions can affect the London eye in a number of ways examples — utilisation can be affected in a number of ways. Unfortunately, the weather at that time was being stubbornly British, and although Concorde was heard, it could not be seen due to the cloud cover. Not just specialists or rich people, but everybody.

Next

About Us

london eye project management

How many people can it carry? Firstly, its objectives have fully achieved. We introduced the visual tagging system from Scafftag in 2006. In two years it ranked not only as one of London's top attractions, but also one of Britain's top attractions. In addition, it is also the world's largest observation wheel with a diameter of 135 metres 450feets and 1600 tonnes, which carried 32 capsules of up to 25 people on a half-hour continuous ride above London 2009. A bomb blast around the London eye could totally destroy it or cause massive damage making the London eye unrepairable while a terror threats would force the staff to evacuate tourists on the London eye. Summertime schedule 10am — 9.

Next

The London Eye by Rebecca Mac Mahon on Prezi

london eye project management

A number of upgrades will be made to each capsule in addition to a minor visual facelift. Project Initiation Strategy 2 2. Many complaints filed against the London Eye, is placing to close to the Westminster. Karen Wickenden, Health, Safety and Environment Manager for the London Eye explains:. Nearest Tube: Waterloo Jubilee, Bakerloo, Northern Train: Waterloo What is the London Eye? It is important to remind people of all the exciting things there are to see and do not only in the capital, but the country as a whole. The basic and extended project life cycles Concept During this phase the business problem to be solved or opportunity is identified or established.


Next

The London Eye, 'Project Isis'

london eye project management

Many projects were helped along by the. The highly efficient construction process resulted in significant savings for the client. The system is so simple and self explanatory that it required little training,. You 'embark', 'check-in' and 'disembark' as you would a flight on its more usual fleet of planes, and security was just as tight - bags are searched and you get brushed with the metal detector before you get on. They may have a direct or indirect interest in the business, and may be in contact with the business on a daily basis, or may just occasionally. See excel document for breakdown. Originally, it was intended as a temporary structure, able to be dismantled and transported to a new location, and had planning permission for just five years.


Next

London Eye project manager leaves Mace

london eye project management

The hope was that Lambeth Council and the mayor would look at the London Eye and see it as a permanent landmark on the London cityscape. Overall maintenance costs and construction costs take up most of the London eye. This meant that there was no other option but to attempt to build it over the river in the horizontal position, and then once the circle was complete, raise it to the vertical. Project termination strategy 15 5. If you don't like heights, then it's probably best to avoid the Eye. Since this was going to be a once-in-a-Millennium date, good burghers across the land sought to decorate their towns and cities with new buildings, which would mark the occasion, and would also, hopefully, bring in tourists to marvel at the new architecture.

Next

The London Eye, 'Project Isis'

london eye project management

No single life cycle model is applicable to all projects although certain types of projects such as a construction project for a sports event such as the Olympics may be associated with a particular life cycle. As each capsule is removed, it will travel down the Thames to Silvertown in London s docklands where it will be loaded onto a truck and transported to a workshop in Worcester to be upgraded before returning to the London Eye. The above 4 stages describe the basic project life cycle, an example of a basic life cycle project is a software development project. Despite this, it still only had temporary planning permission. By putting this system in place within the company, the London Eye has made sure that it complies with regulations to make employees aware of any hazards posed by equipment, and if any incidents or accidents do happen, they are able to quickly find out why and how. Where most people would denounce London's urban sprawl as ugly, personally, the London as a whole makes much more sense than just taking in pretty parts.

Next

About Us

london eye project management

For an insight as to just how enormous the lifing operation actually was, click to see 10 days of work fly past in a time lasped video of the operation. With the visual tag, staff who have just started their shift can clearly see the latest status of equipment i. Quality means that all parts for the London eye is made to specification and the assembly is made to specifications. She now teaches computers at and in Sevenoaks Kent. With the Olympics just three years away, this is the kind of investment that we hope to be seeing across the whole country, she continues. British Airways stepped in, formed a partnership with Marks Barfield, and managed to provide the loans needed to kick-start the project. The media were unsurprisingly scathing, lazily dubbing it the 'Wheel of Misfortune'.

Next

Project management

london eye project management

Come 31 December, the Millennium Wheel would be gently turning, with the Prime Minister, the great and the good, and members of the local community on the first 'flights' on the Eye. The wheel design was used as a metaphor for the end of the 20th century, and time turning into the new millennium. After being built in the short timespan of 16 months, an almost non-project has provided London with its fourth tallest structure and a brand new landmark, which has been, to the surprise and delight of many, accepted by the public. To ensure its safety inspections and process meet and exceed requirements, the London Eye has successfully implemented a visual tagging system from equipment status management specialists Scafftag. The majority of information is collected from journal articles, academic books , libraries, and websites, etc. Tassoni p, 2007 childcare education 3rd edition page 44 This activity will also support their language. Undeterred, and probably breathing a sigh of relief that the other cables didn't go and the whole lot didn't come tumbling down, the design team planned for another attempt at raising it to the vertical four weeks later.


Next

Facts about The London Eye

london eye project management

As you are gently carried up to heights that only a helicopter or light aircraft could reach with much larger windows and less noise, in a way, you do feel as if you are flying, gently and silently navigating a circular thermal over the river. After consultations with Scafftag, we trialled their visual tagging systems for our ladders. People actually genuinely liked it, and its popularity with caused it to have unusual and unexpected side effects. The London Eye can carry 800 passengers at a time on a thirty-minute ride. A project lifecycle is typically an analogy used to describe the idea for, creation of and subsequent demise of a product or outcome. This is a reference to the fact that the pod's glass is curved, which does distort things slightly, but to counter that, the best advice is look out of the bits which have the most gentle curves thus minimising the distortion of the view. The pods or capsules were manufactured by cable-car specialists in the French Alps.